Nico Products Loading Dock Relocation

Overall Project Size: 
50,000 SF

Client: 
The Lindgren Group

Architect: 
CNH Architects

Loeffler Role: 
Preconstruction & Construction Services

 

Project Spec Sheet: 

Nico Products Loading Dock (1287 KB)

Due to street reconfiguration in the area, the loading docks of the Nico facility were required to be relocated from one area of the building to another. This relocation required moving of critical plant operations including steam boilers, electrical distribution panels and production lines. All work was done in detailed phases such that the operations of the plant were never shut down.